06/16/2009 - Negotiations Held at the Top Level
The topic of negotiations held on the 15th of May, 2009 between the Director General of OOO “Stroycomplect-2” (Limited Liability Company), Mr. Yury Rekunov, and the Minister of Works and Transportation of the Republic of Uganda, Mr. John Byabagambi, was reconstruction of a railway network in the Republic of Uganda with the view of improvement of its traffic capacity.
PHOTO GALLERY
Feed Processing Plant of Charoen Pokphand Foods Public Company Limited (Thailand), Lukhovitsy
Geological and topographic surveying, development of a detailed design of reconstruction of a railway siding to the feed processing plant. Complete overhaul of 501 linear meters of the existing railway siding and railway crossing. Construction of a new second railway siding track of 380 linear meters including laying of power switch and two in-plant railway crossings. Design and installation of a maneuvering gear (elevator). Preparation and approval of Railway siding operation and Track certificate by ÎÀÎ Russian Railways (Open Joint-Stock Company).
Railway siding tracks to the feed processing plant
In-plant crossing made of cast concrete
Railway scales
Carriages unloading area
Poring device
In-plant buffer stops
Maneuvering gear (elevator)
Point of connection of a new track and the repaired one